![]() |
#4 |
Senior Member
Join Date: May 2010
Location: Florida and Penna.
Posts: 4,471
|
![]()
I would say you need a new radiator shop. It should have been
pressure tested when they finished it. I just had two 36 radiators rodded out, a new over flow tube on one and extensive repairs to one top tank that has several large splits. Plus they straightened the fins. I told them not to paint them I would take care of that. Stopped by their shop yesterday to see how the second one was coming and they were just putting the new over flow tube on. I said I will pick it up in the morning, how much do I owe you, I will bring a check. He said how's $180.00 sound for the two of them, I said $200.00 sounds better. I think $180.00 was way to low. G.M.
__________________
www.fordcollector.com |
![]() |
![]() |
|
|
Sponsored Links (Register now to hide all advertisements) |
|