|
Sponsored Links (Register now to hide all advertisements) |
|
![]() |
Thread Tools | Display Modes |
![]() |
#1 |
Senior Member
Join Date: Mar 2014
Location: Salem, Ohio
Posts: 1,058
|
![]()
Currently, I have several heads under way, for both myself and Snyder. Things are moving along with all of that, just not quite as quickly as I wish.
The new replacement single carb intake manifold is ready to make sample castings. I have the fixture already cast, but I need to machine the base of it for installation in one of my horizontal machining centers. Snyder is very anxious for this. I assume he has back orders to fill. Don has ordered a run of my new cast headers which replace the old version. The blocks are getting closer to reality as the new core shop nears completion of their core process for the upper assembly. This has been the main delay of getting this going right now. Fixturing for the block is sitting, and waiting. This is alright with me because I am finishing up the last of my Cleveland blocks in the machine I will run A blocks in. I have several of those to finish up before I could machine an A block completely in that machine anyway. All of this is an addition to my every day regular work. There is a lot to do and a lot to keep on top of. I'm doing my best. Tod |
![]() |
![]() |
|
|
Sponsored Links (Register now to hide all advertisements) |
|