|
Sponsored Links (Register now to hide all advertisements) |
|
![]() |
Thread Tools | Display Modes |
![]() |
#1 |
Senior Member
Join Date: May 2010
Location: SPEEDWAY INDIANA
Posts: 4,148
|
![]()
I call this a fairy tale because it went just perfect !!!!! Usually dont felt pretty good today and worked on some past orders .
Crab build.. 1- Core bags from Terrys secret stash.. 2-should be complete ??? Not 100% but good , only had large timing tag instead of small one, he has a box of both 3-11A weights and spark ring , spray with lube 4-assemble the advance parts with new spacer and snap ring ( thanks third generation) 5 NAPA parts echlin heavy duty , soak point sin the marvel sauna and wipe clean ( helps the fiber blocks ) 6-Lube back side of rubbing block to have lasting lube . 7-Use all new stainless socket head screws 8-Install shaft and breaker plate , using large snap ring 9-Use napa fa54 Condesnor ( have had good luck with these almost never failing) 10 lube and install spark brake piston , tighten to three turns 11- run on distributor machine , adjust each side of the points , run for 5-10 minutes at 2000 rpm and recheck for wear ??? 12-confirm 11 degrees of spark advance 13 - Install the Bubba sticker ans ship to customer ....... A fairy tale day for sure . Note , You guys didnt think i could actually quit doing this did ya !!!! ![]() ![]() ![]() ![]() |
![]() |
![]() |
|
|
Sponsored Links (Register now to hide all advertisements) |
|