View Single Post
Old 08-30-2021, 12:29 PM   #441
Floyd
Senior Member
 
Join Date: May 2010
Posts: 468
Default Re: 1932 The Deuce, Dually, Dump Truck

The preheating to 900 degrees F is the required temp before brazing or more cracks will occur either immediately or later on due to the thermal stresses. The cooling down must be as slow as possible, 24 hours is the target.
Floyd is offline   Reply With Quote