Sponsored Links (Register now to hide all advertisements)
On my Tudor top I installed it in the winter, turned the heat on and began when the temperature was above 70*. I then remove what I got done and started over the next weekend after I got the heat above 80*. Two days later I was finished and the top was nice and tight!