Quote:
Originally Posted by Tom-MI
Rocklfa-
I can't imagine how these wiring looms could be assembled fast enough to support a moving production line.
Tom
|
I have wondered the same thing myself. They must have had enough people assembling the caps, wires, and loom units in a different part of the factory so that the assemblies were available at the right time on the assembly line.