View Single Post
Old 03-11-2013, 10:28 AM   #34
LSJUNIPER
Senior Member
 
Join Date: Aug 2011
Location: CT
Posts: 215
Default Re: Flathead project

It was dipped in a hot tank about 3 times, 2 days per dip. Mark at Eastwoods auto said it was a dirty block. After the hot dip Mark pressure washed it. He then rough bored the cylinders .030 over.
LSJUNIPER is offline   Reply With Quote