Thread: 1911 project
View Single Post
Old 03-29-2019, 06:37 PM   #17
art ebeling
Senior Member
 
art ebeling's Avatar
 
Join Date: Dec 2014
Location: Hillsboro IL
Posts: 479
Default Re: 1911 project

Today I removed the body from the frame and started dry fitting some pieces. I have installed the rear brakes and rebuilt the brake lever pawl by welding and shaping the tip that was worn down. I have also put new transmission band linings on. Art
Attached Images
File Type: jpeg 3E0EC1D8-D726-4D45-A792-3B1172469052.jpeg (124.0 KB, 35 views)

Last edited by art ebeling; 03-29-2019 at 06:44 PM.
art ebeling is offline   Reply With Quote