View Single Post
Old 09-06-2019, 01:08 PM   #17
DavidG
Senior Member
 
DavidG's Avatar
 
Join Date: May 2010
Location: southeastern Michigan
Posts: 10,101
Default Re: Ford engine factory break in process

Tim,


That's W.R. Campbell, Ford of Canada President, stamping C18D-1 on April 30,1932 at the Walkerville, Ontario engine plant (a town with many name changes during the period including East Windsor that I used above). Note that the date is 51 days after Henry Ford stamped 18-1 already installed in a chassis. A keen eye will note the differences in the block casting that took place during those 51 days.
Attached Images
File Type: jpg Book photos 216.jpg (48.0 KB, 47 views)
DavidG is offline   Reply With Quote