Next I installed the windlace on the door, the door panel, all clips and molding. Did the panels on side #2, drivers door windlace and door clips...4 hours.
Finally, the escutcheon plates, handles, drivers door panel and molding. Install the seat "flaps and bellows" which insulate the passengers from the trunk and installed the seats, tacked the trim to the package tray and installed the tray. Installed the carpet and brushed it all clean...5 hours.
The final pics are of the coupe ready for the customer to drive it home. Total time to install interior and prepare and woodgrain the 8 moldings...42.5 hours....of fun !
NEXT !