Sponsored Links (Register now to hide all advertisements)
Quote:
Originally Posted by dean333
After some research I think the point is moot. My floor would need to be 6” thick and it’s only 4”. I’m limited, in a townhouse/duplex unit.
|
A 4-post is probably the best option. You could have your concrete cut, drill holes for re-bar into the existing and then pour new concrete being mindful of edge distance to walls. Bendpak had good recommendations on this link,
https://www.bendpak.com/car-lifts/co...-requirements/
Glenn