|
Sponsored Links (Register now to hide all advertisements) |
|
|
Thread Tools | Display Modes |
04-05-2016, 11:08 AM | #1 |
Senior Member
Join Date: Apr 2016
Location: ohio
Posts: 147
|
35/6 pu Frankenstein thingy
Going into my 4th month of the rebuild and I've just about wrapped up the rolling chassis.
Started off as a bit of a mess because though it's been parked for at least 3 decades under a leaking roof and sometime before it was parked the last time its had its share of mods. And it was missing a lot of parts. It did come with a 8ba mostly complete. Also a side shift trans a 40ish steering column, incomplete 39 brakes and I think a 39 rear end. So in my first picture I'll unveil the chassis, I've rebuilt the column and pedal assembly, repaired some of frame all new bushings ang shackles, rebuilt or replaced the entire brake system and reconstructed the missing parking brake, fuel line and sending unit, rebuilt hubs. Last edited by grovesmr; 04-05-2016 at 01:20 PM. |
|
|
Sponsored Links (Register now to hide all advertisements) |
|